Foundations & Brickwork
The first stage of construction is the foundations are over sites, the foundations are dug to the correct depth and inspected by the local council.
After inspection the concrete can be poured which is then left for up to 7 days to full set before the initial brickwork up to damp course level.
After The damp course has been inspected the block and beam floor is installed and the external brick and block walls are created